Directional Drilling Equipment a Key Component of Company Results

 

Giannetti Contracting

 

A third-generation, family-owned business, Giannetti Contracting Corporation leads and executes million dollar governmental, public- and private-sector construction, and infrastructure projects. Based in Pompano Beach, Florida, Giannetti Contracting Corporation guides the projects from beginning to end, from breaking ground and inserting utilities, to paving the foundation and more.

There are various aspects of underground utility installation. One major component of this demanding specialization is the installation of pipes across an open field. Tools used to complete this and other related jobs are referred to as directional drilling equipment. The latest in advanced technology in the construction industry, directional drilling equipment, operated by skilled, experienced professionals, helps to ensure the pipes are placed correctly each time.

With the accuracy of the equipment, the obstacles surrounding the construction site location, such as any landscaping, paved surfaces, or wooded areas are left untouched and unharmed. Additional benefits of using the directional drilling equipment include a savings of money and time, as the machinery allows the tasks to be completed quickly and efficiently.

Advertisements

EXCAVATING & GRADING

75dcef_c3161ede1fc84eb98f2831cafa83b8e1Whether your project consists of a simple or detail excavating needs, Giannetti can perform all your detail excavating needs. With an experienced staff of operating engineers, Giannetti can stage a safe, multifaceted excavation, under the most grueling circumstances.

In addition to our operating engineers, we employee an equally qualified staff of skilled laborers needed to work alongside our equipment.

Regardless of the size or the complexity of a project, staging and coordination with other subcontractors is critical. Planning of any excavation begins during the bidding stage of the project, when the estimator reviews plans and begins to formulate a staging plan. This staging plan is reviewed with the general contractor, prior to the submittal of any proposal, in order to reduce any conflicts with other subcontractors. It is through staging and coordination that Giannetti meets and often exceeds project schedules.